




- Residential
- Additions
- Commercial
- Industrial
- Steel
The build tool
Design your build and see the price
Every answer redraws the mark into your house.
One question at a time · Five renderings · The price beside them- Lot walk, week 1
- Design, weeks 2 to 10
- Permit, weeks 8 to 16
- Build, months 5 to 13
- Keys, month 14
Built
See the workCommon questions
- Planning figures: $245 to $520 a square foot by finish tier. Site, lot and design move it. Draw your line for a range on your own house.
- Most custom homes take ten to fourteen months from permit to keys. Commercial and steel buildings are often faster; the estimate shows a range.
- Yes. The lot walk is the first step: we walk it together and talk grade, access, utilities and views before anything is drawn.
- Red iron rigid frame for wide clear spans and heavy loads; galvanized light-gauge for smaller shops and barns. The steel estimator prices both.
- Finish an estimate and press Confirm pricing. We review it, send a planning set within five days, and set the lot walk.
Something not covered here? Call 208.390.5339 or email slinebuild@outlook.com.